Wednesday, June 15, 2011

Amethyst Farm Job

I'm just starting a major renovation at Amethyst Farm in Amherst. The job involves two phases. In the first phase we are updating the systems in the main farmhouse including removing knob and tube wiring. Also removing suspended ceilings and replacing them with drywall. Removing wall to wall carpet and refinishing the existing floors. We will be replacing the fiberglass insulation in the attic with 18" of cellulose, and insulating the basement walls. We will be installing a new set of stairs to access the basement.

Phase two involves a total gut of the existing Ell including adding a second story.